1. Initial Assessment and Planning:
a. Conducted a thorough assessment of existing processes and machinery.
b. Defined requirements and objectives for the traceability system.
c. Established a project timeline and allocated resources accordingly.
2. System Design and Configuration:
a. Developed the Unified Namespace (UNS) to standardize communication across different systems.
b. Configured Ignition platform to interface with all 370+ assets.
c. Designed and implemented master configurations for machines, SKUs, and operators.
3. Integration and Testing:
a. Integrated barcode scanners and other necessary hardware across the production line.
b. Conducted extensive testing to ensure data accuracy and system reliability.
c. Developed and tested real-time dashboards and mold life tracking functionalities.
4. Training and Deployment:
a. Provided comprehensive training for operators and managers on the new system.
b. Gradually rolled out the system across the production floor, ensuring minimal disruption.
c. Gathered feedback and made necessary adjustments to optimize performance.